Serving Arizona for 16 Years
Fann Environmental is proud to work on projects throughout the state of Arizona. During our history we have created hundreds of facilities and have provided many corresponding services. Here are just a few of our projects that we would like to highlight.

St. Johns
Radium Treatment Facility
Design-Build
The FE team served as the general contractor on this project, which consisted of the construction of a 1.1 million gallon a day Drinking Water Radium Treatment Facility...
Learn More
City of Page
Job Order Contract
JOC
FE has completed several job order contract projects for Page Utility Enterprises...
Learn More
Valley Vista and Rimrock Arsenic Removal EPA Demonstration Projects
Design-Build
FE was the Design Builder of the adsorption systems and provided the on-site engineering, including all of the permitting, installation and construction of the concrete slab, treatment building...
Learn More
Prescott Valley
North Well Field
Phases 1 & 2
Design-Build
This Design Build project included the design and installation of five new water production wells and buildings...
Learn More
Chino Valley
Wastewater Treatment Facility
CMAR
This project included the construction of a one million gallon a day Enviroquip/Kubota MBR treatment plant, lift station, effluent booster facility, and gravity main...
Learn More
AZ State Parks
River Island Unit at Buckskin Mt State Park
Water General Contractor
FE constructed a new water booster station, water storage tank and Iron/Manganese Greensand Treatment facility ...
Learn More
Sedona
Major Pump Modification
CMAR
This project was developed as an extensive upgrade and modification to the City of Sedona’s three major lift stations...
Learn More
Prescott Valley
Wastewater Treatment Facility Expansion
Wastewater General Contractor
This project consisted of a 1.5 million gallons per day expansion and upgrade to the existing 2.25 million gallons per day plant...
Learn More
City of Prescott
Sundog WWTP Nitrification / Denitrification Upgrades
Wastewater General Contractor
This project consisted of the construction of nitrification and denitrification improvements including integration and programming...
Learn More
City of Prescott
Airport Wastewater Reclamation Facility Expansion
Wastewater General Contractor
This project was a joint venture of Fann Environmental and PCL...
Learn More
Southwest Center Well #8 Arsenic Treatment Facility
Water General Contractor
Fann Environmental completed both phases of this project located in the Verde Valley for Arizona Water Company...
Learn More
Wickenburg
Airport Zone 4 Booster Station
JOC
This JOC project for the Town of Wickenburg consisted of building a new booster station to better pressurize and serve a portion of their water distribution system near the airport...
Learn More
Antelope Point Marina Arsenic Treatment Facility
Water General Contractor
FE installed an owner-purchased ADI 75 gpm Arsenic Removal System to serve the Antelope Point Marina Resort in Page, AZ...
Learn More
City of Sedona
Sewer Cleaning and TV Inspection
Wastewater General Contractor
The project consisted of cleaning the collection system pipe and manholes. Then utilizing a robotic camera, Fann Environmental inspected the integrity of the pipe...
Learn More
Flagstaff Ranch
Arsenic Treatment
Water General Contractor
Fann Environmental installed and mounted customer-supplied equipment including an AdEdge arsenic skid filter assembly, bag filter, backwash tank and pump, as well as...
Learn MoreARCHIVED PROJECTS