Construction Manager at Risk Projects

Bright Star Subdivision Booster Station and Reservoir
Owner: Granite Investments and Development
Delivery Method: Construction Manager at Risk
Contract Value: $1,071,637 (Finished under at $905,028)
Year Completed: 2009
Scope of Work: FE served as the CM@Risk for this 1 MG storage tank and booster station project.FE worked with the developer and a local engineering firm to provide constructability
reviews, value-engineering, opinions of probable costs and to subsequently construct the facility. FE also worked closely with the Town of Chino Valley to obtain their input and system requirements. The tank and booster station improvement became part of the Town of Chino Valley’s Water System. The project was completed under budget.

Chino Valley Wastewater Treatment Facility
Owner: Town of Chino Valley
Delivery Method: Construction Manager at Risk
Contract Value: $13,000,000
Year Completed: 2004
Scope of Work:This project was developed as a unique public/private partnership. Fann Contracting financed and constructed this 1.0 mgd facility. This Construction Manager at Risk project was completed by the Fann Environmental team with design by Aqua Engineering, Inc and included the construction of a one million gallon per day Enviroquip/Kubota MBR treatment plant, lift station, effluent booster facility, and gravity main.
The Fann Environmental team began work on this project at the 60% design phase. The work included scheduling, constructability reviews, and value engineering during preconstruction. The FE team visited MBR treatment plants and assisted the design engineer with equipment selction. It also developed cost saving changes to the headworks and piping schemes.
Fann Environmental provided 10 years of operational and maintenance services to Fann Contracting, Inc for this facility.