City of Sedona
Major Pump Modification

Scope of work
This project was developed as an extensive upgrade and modification to the City of Sedona’s three major lift stations. The design of the project had been undertaken by the City two times in the past. The City hired Fann Environmental to perform a complete review of the previous plans and assist the design engineer with design revisions. FE completed constructability reviews, cost estimating, and value engineering.
The Fann Environmental preconstruction services scope of work changed during the project to include full electrical design services.
The construction phase of the work included three new bypass Lift Stations, upgrades to the existing Lift Stations, major electrical/controls changes, and safety modifications.
Ultimately, the project had five guaranteed maximum price contracts.
The Fann Environmental preconstruction services scope of work changed during the project to include full electrical design services.
The construction phase of the work included three new bypass Lift Stations, upgrades to the existing Lift Stations, major electrical/controls changes, and safety modifications.
Ultimately, the project had five guaranteed maximum price contracts.
Project details
Owner: City of Sedona
Delivery Method: Construction Manager at Risk
Role:
Contract Value: $6,453,205
Year Completed: 2011
Delivery Method: Construction Manager at Risk
Role:
Contract Value: $6,453,205
Year Completed: 2011