Arizona State Parks
Slide Rock Wastewater Treatment Plant and Restrooms

Scope of work

Fann Environmental was selected as the Design-Builder from an extensive list of state and national firms using the Performance Information Procurement Systems (PIPS) process.
Fann Environmental teamed with Engineering and Environmental Consultants, Inc. to perform the wastewater treatment plant civil design work. Summit Controls, LLC, completed the electrical design, and FE completed the architectural and structural design services.
The project includes a 15,000 gpd Enviroquip/Kubota Membrane Bioreactor wastewater treatment plant, a 3,600 sq. ft effluent holding pond, influent and effluent pump stations, a remodel of an existing restroom, and the construction of a new restroom and maintenance building. Fann Environmental was responsible for all aspects of the Design and Construction. FE was later contracted to perform additional work on the existing parking lot.

Project details

Owner: Arizona State Parks
Delivery Method: Design-Build
Role:
Contract Value: $1,999,135
Year Completed: 2010