Fann Environmental served as the general contractor on this project which consisted of the construction of a 1.1 mgd drinking water Radium Treatment Facility. Utilizing value engineering, FE worked with the City of St. Johns and engineer to reduce costs and bring the project back into budget. The project included the construction of an Ion-Exchange Treatment System and treatment building. It also included training, start-up and commissioning of the entire system. The project was funded by WIFA.

Project details

Owner: City of St. Johns
Delivery Method: Design-Build
Role:
Contract Value: $991,000
Year Completed: 2005