City of Prescott Zone 16 Tank,
Booster Pump Station, Water Main

Scope of work

Working as a subcontractor to Fann Contracting, we constructed a new City of Prescott water booster station located at the end of South Virginia Street in Prescott, AZ. The new CMU block building houses new electrical controls and five new horizontal split-case booster pumps. This new booster station will be used to pump water to the new Haisley Water Storage Tank and will have the ability to bypass the Haisley tank and pressurize and maintain pressure in the City of Prescott Pressure Zone 16 by use of variable frequency drives and pressure transducers. The old Virginia Street Booster Station was demolished and a new emergency generator installed in its place to provide back-up power to the new booster station. New SCADA controls were also added.

Project details

Owner: City of Prescott
Role:  Subcontractor
Contract Value: $1,921,681
Year Completed: 2020